Home decoration is often easy to decorate and difficult to maintain. If you don’t maintain it properly, your previous efforts will be discarded. The same is true for mosaics. If you try your best to pave and are affected by improper maintenance, it will not be worth the loss. After mosaic paving, the treatment and maintenance are very important.
1: Check the details
After all the walls are paved, the adhesive layer is finally set, and after the jointing is completed, do another check. The floating sand left in the seam can be gently taken out with a clean damp soft brush, and the excess rice strips Use 1:1 cement mortar to smooth the split joints, and then wipe them with a cloth. When the bonding layer and jointing mortar are finally set, clean them.
2: Do a good job of air drying
After the mosaic paving is completed, attention should be paid to the protection of the finished product, and proper air drying can be carried out. The surface layer that has just been paved should avoid sun exposure, and the room should be properly ventilated. It should be maintained until about 24 hours after the completion of the work. Generally, the post-maintenance of the mosaic mosaic should be no less than 7 days.
3: Clean
When the bonding layer and jointing mortar are finally set, you can start to clean the mosaic surface. For cleaning, you need to prepare two buckets, one for new detergent and the other for clean water. First, soak the cloth in the bucket with detergent without wringing out, and then wipe the mosaic surface in a circular manner: then in the second Soak a sponge in a clean bucket, and then wipe the surface of the mosaic with the sponge to wipe off all the residue. Finally, wipe the surface with a sponge again until it is clean.
4: Install switch socket
After the paving and drying are completed, the switches and sockets that have been removed from the power supply need to be reinstalled. In this way, the process of wall mosaic paving was successfully completed.